Search Kat's Pottery Blog

Friday, July 30, 2010

Insulation and electrical.



We finished the insulation last night. Eric and Larry did a whole lot of work for this, especially sweating in the hottest week of the year! What a week to install insulation.


Pictures after a storm, thats right we got about 5 minutes of rain!!!


This flower and the flower at the bottom are results of a lot of work mom dad and I did a few months ago. These two flowers cost me about 40 dollars and 400 calories.


Thanks to cousin (not uncle) Donnie and his team from NC, we have electricity and a framed bathroom wall!!!

Portholes.


Outside meter base.


Another expensive flower.

I dont know how I am going to thank all of the people that have really put a lot of work into my studio. I suppose once I get to work in there Im really going to have to crank some awesome pots to give out to people, except Eric who already has too much of it ;) You cant even begin to imagine how much I appreciate you.

Sunday, July 25, 2010


Things are really coming along at the studio, so much is going on that I havent had time to post. We chose a nice deep red color for the trim work, and its been a real fun time painting it! (psych)




There are so many freakin bugs out there and they all seem attracted to the fresh paint!!! This week we found out that grasshoppers eat the wood trim around doors.


What a pretty sunset this was!! As soon as I can, I will get pics up of the insulation and some interior.

Wednesday, July 14, 2010

Studio time


This corner is the bathroom. Later that day I think it was framed in. Its amazing how fast stuff gets done once you put your mind to it and your family working on it!!
Just wanted to post a few quick pics of the building. It even looks more different than this now! There is a barn door and we have started to paint the trim. Its a building!!!
My Dad, Eric and my brother all worked really hard last week painting the stain on the outside, youll be shocked at how different it looks now.